LINE A-04
SHIFT 2
BATCH B-2291
--:--:-- UTC● LIVE (simulated feed)
First-pass yield
94.2%
▲ 0.8 vs target
Open defects (queue)
18
3 novel flagged
Avg confidence
75%
Est. scrap loss / day
$3.9K
Base scenario
INSPECTION #88213
Defective
Steel bracket SB-140
STRUCTURAL CRACK · 0.4 mm
X 451 · Y 218 · 143×282
CAM-04 · 14:31:52
CONFIDENCE92%
CLASS
Structural crack
Open inspection →
Defect trend
7 batch

Defect rate by batch, line A-04 · threshold 3.0%

NominalElevatedRoot cause →
Bottleneck ranking
by throughput drag
StationCycleUtilWIPConstraint score
Press 0241s98%42
85
Weld 0538s91%27
54
SMT-B Reflow35s88%22
41
Assembly 0133s84%18
33
Economic impact
SIMULATED
Scrap cost / day$3,921
Rework cost / day$778
Throughput loss-121 u/day
Net margin impact-$9.6K

Advisory estimate from Line A-04 model. Not a financial forecast.

Open what-if simulator →
Investigation recommendation
RANK 1 / 4
Verify Press 02 die alignment and warm-up profile after changeover
DEFECT · Structural crack→PROCESS · Changeover B-2291→BOTTLENECK · Press 02 util 98%→COST · -$3.9K scrap

Association, not proven causation. Confidence in link 71%. Recommended first due to largest marginal loss.

OPEN INVESTIGATION LOG